In this method area is divided into a number of squares and all grid points are marked (Ref. Thus in this method horizontal control is established first and then the levels of those points found.Īfter locating the points on the plan, reduced levels are marked and contour lines are interpolated between the selected points.įor selecting points any of the following methods can be used: In this method, levels are taken at some selected points and their levels are reduced. This method is slow, tedious but accurate. It is better if both are nearby to communicate easily.įor getting speed in levelling some times hand level and Abney levels are also used. The level and survey instrument need not be shifted at the same time. Plane table survey is ideally suited for this work.Īfter required points are established from the instrument setting, the instrument is shifted to another point to cover more area. Thus, several points are established on a contour line on one or two contour lines and suitably noted down. It is followed by establishing horizontal control. A surveyor establishes the horizontal control of that point using his instruments.Īfter that instrument man directs the staff man to another point where the same staff reading can be found. The instrument man asks staff man to move up and down in the area till the required staff reading is found. The plane of collimation/height of instrument is found and the required staff reading for a contour line is calculated. A level is set on a commanding position in the area after taking fly levels from the nearby bench mark. It consists in finding vertical and horizontal controls of the points which lie on the selected contour line.įor vertical control levelling instrument is commonly used. There are two methods of contour surveying: Based on the instruments used one can classify the contouring in different groups. If the theodolite is used, both horizontal and vertical controls can be achieved from the same instrument. To exercise vertical control leveling work is carried out and simultaneously to exercise horizontal control chain survey or compass survey or plane table survey is to be carried out. However, if your land has a fairly steep slope it may be worthwhile considering a split-level design, which will reduce overall construction costs.Contouring in surveying is the determination of elevation of various points on the ground and fixing these points of same horizontal positions in the contour map. Generally speaking, the greater the slope of the land the greater the cost to build. So it’s a good idea to ask your builder to undertake a Contour Survey and soil test to firm up the price of your build before you sign a tender. This means that the tender will be subject to a Contour Surveyor and site investigation, and therefore allowances will be made for these items. Some builders will not undertake the Contour Survey until after the tender has been signed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |